Monday 21 May 2018

I got up at 5am to drive to East Coast to pick up my plywood. It rained for most of the drive, but a weather window opened just as I got into Vero Beach so I didn't have to load the plywood in the rain. The good thing about having a 36 gallon gas tank is I made it there and back on less than 1/2 tank.


The boatbuilding is now officially underway. Finn thinks it is a very serious matter.


Today, I laminated pieces for the floor and sides of the boat. Puzzle joints made joining pieces for the sides really easy. The garage is a bit of a disaster. Finn is probably going to be upset that his toys are covered in building materials.


No comments:

Post a Comment